Overview
Located on the Big Savage Ridge area near the Maryland-Pennsylvania border, the 139.4 MW wind farm is the largest in the County.
In late 2012, Sargent Electric Company was contracted by Renewable Energy System Americas to prepare the site for civil and electrical construction and to install the infrastructure, cables and equipment.