Alamitos Battery StorageLong Beach, California

US Edison Award Winning Facility

Project Overview

The AES facility is a state-of-the-art energy storage facility utilizing advanced technology batteries and control systems to enhance the Southern California Edison electrical grid reliability and flexibility. Sargent Electric performed as the Prime Electrical contractor responsible for the 230kV to 34.5kV substation, the 34.5kV feeder circuits, the BESS Building’s electrical infrastructure, and the 100MW 4 Hour BESS. The project was completed on time with COD achieved in December of 2021. The project was awarded the prestigious US Edison Award, the highest honor given in the electric power industry.

Project Details

 

Owner:

AES Clean Energy

General Contractor:

Fluence Energy

Size:

400MWH

Completion Date:

December 2020

Alamitos Battery Storage
Alamitos Battery Storage
Full tower

Touch Base

Contact Sargent Electric

Interested in working with us?

We have a wide array of experience and can super-charge your next project. Touch base with us and provide some details about your next project and how we can help!