Project Overview
Sargent Electric performed as the Prime Electrical Contractor self-performing the electrical demolition of the existing infrastructure and the re-powering of the wind farm with more modern turbines. Th work consisted of the installation of the new below grade systems, the 34.5kV/690V wind turbine transformer scope, the LV wiring, the FAA lighting, and the tower wiring of (23) Siemens 2.3MW wind turbine generators. The project was completed on schedule.
Project Details
Owner:
Clearway Energy Group
General Contractor:
Reed & Reed
Size:
50MW
Completion Date:
November 2021