Pinnacle Wind Farm Re-PowerKeyser, West Virginia

Wind FarM

Project Overview

Sargent Electric performed as the Prime Electrical Contractor self-performing the electrical demolition of the existing infrastructure and the re-powering of the wind farm with more modern turbines. Th work consisted of the installation of the new below grade systems, the 34.5kV/690V wind turbine transformer scope, the LV wiring, the FAA lighting, and the tower wiring of (23) Siemens 2.3MW wind turbine generators. The project was completed on schedule.

Project Details

 

Owner:

Clearway Energy Group

General Contractor:

Reed & Reed

Size:

50MW

Completion Date:

November 2021