Pitt Ohio Harmar Trucking TerminalHarmar, PA

Trucking Terminal

Project Overview

Sargent partnered with other suppliers to support Pitt Ohio’s sustainability efforts by creating the region’s first 55,000 sq./ft., LEED trucking terminal. Sargent was responsible for completing the electrical system including the sites microgrid. The microgrid is rated at 70 kW, with an average amount of 7 kW. It is powered by a 50 kW PV system, two 12 kW wind turbines, 80 kWh of battery storage, with backup generators.

Project Details

 
  • Electrical system with microgrid
  • Two wind turbines
  • 80 kWh of battery storage
  • Backup generator